Transition Pieces for an offshore wind farm

Manora Logistics organized the transport of 27 transition pieces, each about 280 ton, 26 meter height and 5 meters diameter, for a new wind farm under construction in the UK. The loading took place on a pontoon that especially for this project has been equipped with a special grillage and sea fastening.