Material for a new wind farm

Manora organized the transport of  two Transition Pieces for a large new windfarm, from Hoboken to Oostende, both in Belgium. The heaviest section of about 650 ton was loaded with Matador 3. In the coming days we will sail with the pontoon to Oostende, were the units will be transferred and installed using Matador 3 again.